RIO GRANDE FLOW / RESERVOIR CONDITIONS        
                     
The Rio Grande Flow Conditions are updated daily, Monday thru Friday at        
approximately 9:35 am Mountain Time/10:35 am Central Time.        
Previous Reports        
                     
The following data are Provisional and are subject to revision.  Stage and flow determinations are made        
for river conditions at approximately 7:00 am to 8:00 am Standard Time unless otherwise indicated.        
                     
  DATE STAGE DISCHARGE RAINFALL WEB          
    METERS             CMS     MM LINK          
RG BELOW CABALLO DAM 4-Apr-25   0.02              
RG AT EL PASO 4-Apr-25 0.655 0.20   8364000          
RG BELOW AMERICAN DAM 4-Apr-25 1.073 0.25   8365000          
AMERICAN CANAL 4-Apr-25 0.575 0.37   8364500          
RG AT FORT QUITMAN 4-Apr-25 1.953 0.09   8370500          
RG ABOVE RIO CONCHOS 4-Apr-25 1.648 0.00   8371500          
RG BELOW RIO CONCHOS 4-Apr-25 0.482 0.19   8374200          
RG AT JOHNSON RANCH 4-Apr-25 0.809 0.22   8375000          
RG AT FOSTER RANCH 4-Apr-25 0.471 8.14   8377200          
PECOS NEAR LANGTRY 4-Apr-25 0.459 2.10   8447410          
DEVILS AT PAFFORD 4-Apr-25 0.621 2.34   8449400          
AMISTAD DAM                    
RG AT DEL RIO 4-Apr-25 0.414 8.70   8451800          
RG AT EAGLE PASS 4-Apr-25 0.878 20.80   8458000          
RG NEAR EL INDIO 4-Apr-25 1.795 22.80   8458700          
RG AT COLOMBIA                4-Apr-25 1.911 16.69   8458800          
RG AT LAREDO 4-Apr-25 0.356 12.66   8459000          
FALCON DAM                    
RG AT RIO GRANDE CTY 4-Apr-25 7.512 2.78   8464700          
RG BL ANZALDUAS DAM 4-Apr-25 23.970 19.16   8469200          
RG AT SAN BENITO 4-Apr-25 11.032 32.06   8473700          
RG AT BROWNSVILLE 4-Apr-25 5.674 97.85   8475000          
                     
ANZALDUAS SALINITY 4-Apr-25 31.850 405 PPM            
                     
STORED WATER IN LARGE RESERVOIRS OF THE RIO GRANDE BASIN        
(Capacities and Storages in Million M3, Elevations in Meters)        
         
Reservoir                     Date Hour Normal Flood Current     24-hr        
    Cons. Control Elev.  Storage Storage        
    Capacity Capacity   (% Cons.) Change        
                     
ELEPHANT BUTTE                 Criteria Checks
4-Apr-25 0:00 2496 2496 1317.395 343 0        
          (14%)       0 1
CABALLO                    
4-Apr-25 0:00 280 403 1260.775 24 0        
          (9%)       1 0
AMISTAD - 08450800                    
4-Apr-25 0:00 3980 6056 320.275 819 0        
Requested 6:00 U.S. 15.00 CMS (21%)       0 1
Release   MEX. 3.00 CMS            
FALCON - 08461200                    
4-Apr-25 0:00 3289 3923 78.300 345 -85        
Requested 6:00 U.S. 2.00 CMS (10%)       0 1
Release   MEX. 22.00 CMS            
                     
STORED WATER IN LARGE RESERVOIRS OF THE COLORADO BASIN        
(Capacities and Storages in 1000 Acre-Feet, Elevations in Feet)        
Reservoir                     Date Hour Total Capacity Current     24-hr        
        Elev.  Storage Storage        
            Change        
LAKE POWELL                    
4-Apr-25 0:00 25,160 3559.19 7,729 2        
LAKE MEAD                    
4-Apr-25 0:00 28,945 1066.01 8,885 -15        
                     
                     
                     
MEXICAN RESERVOIRS      
(Storages in Million M3, Elevations in Meters, Releases in CMS)      
                     
Reservoir                     Date Normal Flood   Current      Spill Percent        
  Cons. Control Chg in Sto. Storage or of        
  Capacity Capacity     Release Cons.        
    RIO CONCHOS BASIN                    
SAN GABRIEL                    
4/4/25 0:00 245 377 -1.250 71.790 14.100 29%        
BOQUILLA                    
4/4/25 0:00 2894 3208 -0.393 424.751 1.300 15%        
F.I. MADERO                    
4/4/25 0:00 355 456 0.000 38.966 0.000 11%        
PICO DEL AGUILA                    
4/4/25 0:00 48 89 0.789 17.272 3.200 36%        
CHIHUAHUA                    
4/4/25 0:00 23 36 -0.018 10.426 0.090 45%        
EL REJON                    
4/4/25 0:00 7 8 -0.004 2.039 0.000 31%        
LUIS L. LEON                    
4/4/25 0:00 292 825 0.000 170.945 0.000 58%        
    RIO SAN DIEGO BASIN                    
CENTENARIO                    
4/4/25 0:00 25 26 -0.283 12.724 0.000 52%        
SAN MIGUEL                    
4/4/25 0:00 21 22 -0.080 19.021 1.000 90%        
    RIO SAN RODRIGO BASIN                  
LA FRAGUA                    
4/4/25 0:00 47 85 -0.082 45.746 0.000 97%        
    RIO SALADO BASIN                    
VENUSTIANO CARRANZA                    
4/4/25 0:00 874 1322 0.000 160.740 0.000 18%        
                     
                     
    RIO ALAMO BASIN                    
LAS BLANCAS                    
4/4/25 0:00 84 134 0.244 30.452 0.300 36%        
    RIO SAN JUAN BASIN                    
EL CUCHILLO                    
4/4/25 0:00 1123 1784 -1.150 1052.860 4.331 94%        
MARTE GOMEZ                    
4/4/25 0:00 782 2209 -1.399 767.706 0.000 98%        
                     
  Contributions from Rio Alamo and Rio San Juan to the Rio Grande are allotted 100% to Mexico per 1944 Treaty      
  article 4 (a)                    
                     
** Usable storage is an estimate of waters in storage which could be released through existing outlet works.